Montgomery County · Horsham · MCPC #24-0080-001
Powell Tract
Cedar Hill Road & 1230 Stongs Lane, Horsham, PA · 3 homes, single family · 8.09 acres
About this project
Spectracon Building & Construction Managers is proposing to split an 8-acre tract at Cedar Hill Road and Stongs Lane in Horsham into four lots. The existing home stays, and three new single-family homes would be built on the new lots, reached by a shared driveway to Biwood Lane. Much of the site is wooded, so tree clearing would be needed.
County planning commission: Supports, with comments
Issues raised: sidewalk waiver; explore pedestrian link to Power Line Trail, tree removal not quantified on site plan, 12-inch storm pipe waiver where 18-inch is required, flag lot variances from zoning ordinance
- Applicant
- Spectracon Building & Construction Managers
- Engineer / rep.
- Woodrow & Associates, Inc.
- Zoning
- R-2
- Approvals needed
- variances for flag lot minimum lot area, flag lot setbacks, adjacent flag lots, and 50 ft side yards (zoning hearing board, Oct 2023), waiver to consider the plan as a combined preliminary/final plan, waiver from aerial plan requirement for features within 400 ft, waivers from road widening, curbing, and sidewalk requirements, waiver to allow 12-inch storm sewer where 18-inch is required
- Utilities
- public water, public sewer
Filing history
- 2024-04-05 · MCPC #24-0080-001 · Land Dev Plan, SubDiv Plan, Prelim Plan · 3 homes
County review letters
2024-04-05 · HORSH 24-0080-001r.pdf
The full picture AI research
This project hasn't been researched yet. Request it and AI will look for news, township agendas and the builder's plans, then explain it in plain English.
Scope estimate for contractors
Estimated construction value: $1.7M
- ~96 roofing squares
- ~3 HVAC systems
- ~3 kitchens / 6+ bathrooms
- ~8,400 sq ft of finished living space
- ~6.0 acres of site work (grading, stormwater, landscaping)
- Shared driveway to Biwood Lane
- New utility connections for three new lots
- Rain gardens on new lots
- Street trees along full frontage
- Storm sewer piping
- Clearing of wooded area