Montgomery County · Lower Salford · MCPC #22-0183-003
Hiram Hershey Subdivision Lot 13
130 Christopher Lane, Lower Salford, PA · 27,500 sq ft non-residential, industrial · 5.3 acres
About this project
Argus Properties plans a one-story light industrial building of about 27,500 square feet with 54 parking spaces on Christopher Lane in Lower Salford. The 5.3-acre lot is currently undeveloped, with a heavily wooded southern section, and the project would use about 3 acres with two driveways and a stormwater basin behind the building. The county planning commission generally supports the plan but asked for painted crosswalks at the driveways and a stormwater basin designed to protect a nearby headwaters stream.
County planning commission: Supports, with comments
Issues raised: Painted crosswalks needed at driveway crossings on Christopher Lane, Stormwater basin design must protect the on-site headwaters tributary, Basin discharge into wooded portion of the property
- Applicant
- Argus Properties, Inc.
- Engineer / rep.
- S.T.A. Engineering, Inc.
- Zoning
- I-Industrial
- Utilities
- public water, public sewer
Filing history
- 2025-02-26 · MCPC #22-0183-003 · Land Dev Plan, Prelim Plan, Resubmission · 27,500 sq ft
- 2024-11-19 · MCPC #22-0183-002 · Land Dev Plan, Prelim Plan, Resubmission · 27,500 sq ft
- 2022-07-06 · MCPC #22-0183-001 · Land Dev Plan, Prelim Plan · 22,000 sq ft
- 2022-07-06 · MCPC #22-0183-001 · Land Dev Plan, Prelim Plan · 22,000 sq ft
County review letters
2024-11-19 · LSALF 22-0183-002r.pdf
2025-02-26 · LSALF 22-0183-003r.pdf
The full picture AI research
This project hasn't been researched yet. Request it and AI will look for news, township agendas and the builder's plans, then explain it in plain English.
Scope estimate for contractors
Estimated construction value: $3.6M
- ~275 roofing squares (assumes 1 story)
- ~68 tons of cooling (rule of thumb 400 sq ft/ton)
- ~5.3 acres of site work (grading, stormwater, landscaping)
- Sidewalk along Christopher Lane frontage crossing two driveways
- Concrete curb ramps at driveway crossings
- Stormwater basin behind building and parking
- Street lighting added at driveway accesses
- Additional ADA parking space added to the lot