PlannedNearby

Montgomery County · Narberth · MCPC #22-0007-004

714 Montgomery Ave

714 Montgomery Ave., Narberth, PA · 20 homes, apartments · 0.73 acres

About this project

A four-story apartment building with 20 units is proposed for the rear of 714 Montgomery Ave, with the historic 1803 Price House preserved on the front portion and existing additions and a shed demolished. The project includes 18 parking spaces.

County planning commission: Supports, with comments

Issues raised: Conditional use requirements not fully demonstrated in sketch plan, Historic structure preservation and future use approach unclear, Insufficient buffering between apartment building and adjacent residential property to the west, Potential neighborhood character impacts, Green building bonus criteria compliance required

Zoning
5b
Approvals needed
conditional use, Certificate of Appropriateness from Historic Architectural Review Board
Demolition
existing additions to the historic structure and existing shed

Filing history

  • 2026-05-20 · MCPC #22-0007-004 · Land Dev Plan, Sketch Plan · 20 homes
  • 2022-03-29 · MCPC #22-0007-003 · Land Dev Plan, Sketch Plan · 10 homes
  • 2022-02-23 · MCPC #22-0007-002 · Land Dev Plan, Sketch Plan, Resubmission · 10 homes
  • 2022-01-07 · MCPC #22-0007-001 · Land Dev Plan, Sketch Plan · 10 homes

County review letters
2026-05-20 · NARBE 22-0007-004r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

A developer proposes a four-story apartment building with 20 units at the rear of 714 Montgomery Ave. in Narberth. The site is about 0.73 acres. The plan includes 18 parking spaces.

The 1803 Price House would stay on the front of the lot and be preserved. Later additions and a shed would be torn down to make room. The house is a local historic landmark, and the property sits in a historic district.

Online records show the plan is still at an early "sketch" stage. Planning commissioners raised concerns about building size, distance from property lines, parking, and fit with the historic house. They said parts of the plan don't meet current zoning. An earlier submission was withdrawn after a zoning review, and the plan was revised in June 2026. No approval was found. A listing said the property was for sale, so the developer's identity and plans may change.

What it could mean nearby

Where it stands

The plan is at the preliminary sketch-plan stage with Narberth's planning commission, and no approval or vote was found. Next steps usually include revising the plan, possible historic board review, a request for zoning relief or conditional use, and later a formal land development application.

Want to weigh in? Narberth Borough's planning commission is reviewing the sketch plan, and the borough council and possibly the zoning hearing board would decide later; residents can comment at their public meetings, with agendas on the borough website.

Who's behind it

Price House Development LLC

Around the web

Planning terms explained
Sketch plan
An early, informal drawing shown to the borough for feedback before a formal application, with no approval given.
Conditional use
A use allowed only if the borough council finds it meets set conditions after a public hearing.
Setback
The required distance between a building and the property line.
Historic district
An area where changes to old buildings and new construction get extra review to protect historic character.
Land development
A formal borough review process for building new structures or major changes on a lot.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $4.8M