Montgomery County · Conshohocken · MCPC #21-0327-003
Washington Street Residential
401/433 Washington Street, Conshohocken, PA · 481 homes, apartments · 10.66 acres
About this project
KRE Acquisition Corp is proposing to redevelop the vacant former industrial site at 401 and 433 Washington Street in Conshohocken, which also extends into Whitemarsh Township. The revised plan has 481 homes: 200 condominiums in four buildings facing Washington Street and 281 luxury apartments in two buildings along the Schuylkill Riverfront. The site today holds a vacant industrial building, a foundation from a former industrial use, and parking and storage areas.
County planning commission: Supports, with comments
Issues raised: setback from Washington Street is 12 ft instead of the required 15 ft, site lies in the 100-year floodplain, subject to a 2014 settlement agreement, tract split between Conshohocken and Whitemarsh Township
- Applicant
- KRE Acquisition Corp
- Engineer / rep.
- Colliers Engineering & Design (DBA Maser Consulting)
- Zoning
- SP-2
- Tax parcel
- 050011904007
- Cross street
- Cherry Street
- Approvals needed
- setback waiver, subdivision approval, land development approval
Filing history
- 2024-01-08 · MCPC #21-0327-003 · Land Dev Plan, Prelim Plan, Resubmission · 481 homes
- 2021-12-29 · MCPC #21-0327-002 · Land Dev Plan, Prelim Plan · 598 homes
- 2021-12-08 · MCPC #21-0327-001 · Land Dev Plan, Prelim Plan · 598 homes
County review letters
2024-01-08 · CONSH 23-0327-003r.pdf
The full picture AI research · Nov 1, 2026
KRE Acquisition Corp. is redeveloping a vacant former industrial site at 401 and 433 Washington Street along the Schuylkill River. The site is about 10.7 acres. Most of it is in Conshohocken, and part extends into Whitemarsh Township. The revised plan has 481 homes: 200 condominiums in four buildings facing Washington Street and 281 apartments in two buildings along the riverfront.
The site now holds a vacant industrial building, an old foundation, and parking and storage areas. Local news reported that the plan used to call for 598 apartments, under a settlement agreement from about a decade ago. KRE cut the number after judging that too many units would be too much for the market. A homebuilder is reported to be handling the condominiums. Building heights and a river trail stay as previously approved. Site clearing was reported under way in early 2024. No opposition was reported.
What it could mean nearby
- Fewer homes than the earlier 598-apartment plan, and fewer bedrooms (690 instead of 804), which may mean less demand on traffic and services.
- A river trail is part of the approved plan, which could add public riverfront access.
- Replaces a vacant industrial site with housing along the Schuylkill River.
- Adds owner-occupied condominiums as well as rentals.
Where it stands
The borough council approved the revised unit mix as an amendment to the older settlement agreement in March 2024, and site clearing had begun. Next steps usually involve construction permits, building, and any remaining approvals such as sign packages.
- Mar 20, 2024 Conshohocken Borough Council voted 7-0 to approve the amendment cutting the plan to 481 homes with condos and apartments
- Mar 6, 2024 KRE presented the revised plan to Conshohocken Borough Council
- Jan 8, 2024 Latest county filing for the project
- Sep 28, 2021 Whitemarsh Township Planning Commission scheduled to hear the earlier 598-apartment proposal
Want to weigh in? Conshohocken Borough Council and, for the Whitemarsh part, the Whitemarsh Township officials hold public meetings where residents can comment; check their posted agendas.
Who's behind it
KRE Acquisition Corp · KRE is the developer of the apartment portion of this project; no official company page for it was found.
Around the web
- Conshohocken's Borough Council approves switch from all apartments to mix of condos and apartments for riverfront developmentMoreThanTheCurve · Mar 21, 2024Council voted 7-0 to approve the change to 481 homes, with two apartment and four condo buildings.
- Plan for 598 apartments in Conshohocken reduced and will now also include condosMoreThanTheCurve · Mar 6, 2024KRE presented the reduced plan, explained its reasons, and noted the site is mostly in Conshohocken with the rest in Whitemarsh.
- Developer proposes 598-unit apartment building in WhitemarshPatch · Sep 28, 2021Described the earlier 598-unit proposal, the heavy-industrial zoning and expired prior approvals.
Planning terms explained
- Settlement agreement
- A legal deal between a developer and a municipality that sets what can be built, often reached to resolve a dispute.
- Amendment
- A formal change to an earlier approved agreement or plan.
- Condominium
- A home that is individually owned, with shared ownership of common areas.
- By-right use
- A use allowed under the zoning rules without needing special permission.
- Variance
- Official permission to depart from a specific zoning rule.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $115.4M
- ~2,886 roofing squares
- ~481 HVAC systems
- ~481 kitchens / 962+ bathrooms
- ~481,000 sq ft of finished living space
- ~10.7 acres of site work (grading, stormwater, landscaping)
- 10 ft public riverfront pathway with open space and amenities
- Stormwater management under Chapter 102 and 105 permits and an NPDES construction permit
- Zero-net-fill grading within the floodplain
- 707 on-site parking spaces
- Utility line relocations
- Courtyards and outdoor amenity spaces