Montgomery County · Towamencin · MCPC #18-0278-002
Keeler Road Subdivision
695 Keeler Road, Towamencin, PA · 5 homes, single family · 7.24 acres
About this project
Five single-family detached homes are planned on the roughly 7-acre property at 695 Keeler Road in Towamencin Township, with four lots fronting Keeler Road and one flag lot set farther back. The existing house and spring house will stay, while the detached garage and two kennel buildings will be removed. Public water and sewer are proposed for all five lots.
County planning commission: Supports
Issues raised: Board Of Commissioners, Ontgomery Cou, Montgomery County, Executive Director, Background, Comprehensive Plan Compliance
- Engineer / rep.
- Cornerstone Consulting Engineers & Design Services, Inc.
- Zoning
- R-175
- Tax parcel
- 53-00-03968-00-2
- Cross street
- Tennis Circle
- Approvals needed
- major subdivision approval, waivers
- Utilities
- public water, public sewer
- Demolition
- Detached garage and two kennel buildings
Filing history
- 2025-09-19 · MCPC #18-0278-002 · Land Dev Plan, SubDiv Plan, Prelim Plan, Resubmission · 5 homes
- 2018-11-16 · MCPC #18-0278-001 · Land Dev Plan, SubDiv Plan, Prelim Plan · 4 homes
County review letters
2025-09-19 · TOWAM 18-0278-002r.pdf
The full picture AI research · Nov 1, 2026
The Keeler Road Subdivision would split a roughly 7-acre property at 695 Keeler Road in Towamencin Township into five lots for single-family detached homes. Four lots would face Keeler Road. A fifth "flag lot" would sit farther back and be reached by a narrow strip of land.
The existing house and spring house would stay. The detached garage and two kennel buildings would be torn down. All five lots would connect to public water and sewer.
Township planning commission and board of supervisors agendas and minutes show the plan under review from September 2025 into 2026. The records indicate the plan was first approved years earlier and then revived. No news coverage, organized opposition or builder project page was found. The sources do not say who would build or live in the homes.
What it could mean nearby
- Five homes, four of them on Keeler Road, would add some driveway entrances and daily car trips to that road.
- Public sewer is proposed, and township sewer review comments suggest the lots would connect to the Keeler Road sewer line using individual pumps.
- Removing the kennel buildings and garage would end that use of the property, and the historic house and spring house would remain.
- The few added households would put a small additional load on schools and utilities.
Where it stands
The plan is in township review as a combined preliminary/final subdivision plan. It reached the planning commission in September 2025 and the township supervisors' agenda in May 2026. Final approval and recording of the plan were not confirmed, so the next step is a supervisors' vote, then meeting any conditions before the plan is recorded and building permits are sought.
- May 2026 The supervisors' agenda lists a presentation on the 695 Keeler Road subdivision.
- May 2026 A planning commission record notes sewer and county sign-offs and lists commission action as the next step.
- Jan 2026 A time extension for the preliminary/final plans appears on a township agenda.
- Sep 19, 2025 Latest county planning filing.
- Sep 8, 2025 Planning commission reviews the plan and, per the minutes, recommends approval.
- Aug 11, 2025 Township sewer reviewer's letter asks for plan changes on the sewer connections.
Want to weigh in? The Towamencin Township Board of Supervisors makes the decision after hearing from the planning commission, and residents can comment at their public meetings or by contacting the township office.
Who's behind it
Cornerstone Consulting Engineers & Design Services, Inc. · The county filing lists this engineering and design firm; no builder or developer was identified and no company page was found.
Around the web
- Board of Supervisors agenda, May 13, 2026Towamencin Township · May 13, 2026Lists a presentation on the 695 Keeler Road subdivision at a supervisors' meeting.
- Planning Commission minutes, May 2026Towamencin Township · May 4, 2026Notes that sewer and county reviews were signed off for the plan and that planning commission action was next.
- Planning Commission minutes, September 8, 2025Towamencin Township · Sep 8, 2025Records the planning commission's review and a recommendation on the five-lot plan.
- Planning Commission agenda, September 8, 2025Towamencin Township · Sep 8, 2025Shows the Keeler Road Subdivision listed as new business for preliminary/final plan review.
Planning terms explained
- Subdivision
- Dividing one parcel of land into separate lots that can be built on or sold.
- Flag lot
- A lot set back from the road and reached by a narrow strip, shaped roughly like a flag on a pole.
- Preliminary/final plan
- A single review that combines the first and last approval steps, often used for smaller projects.
- Planning commission
- An appointed local board that reviews plans and advises the elected supervisors.
- Grinder pump
- A small pump at a home that grinds wastewater and pushes it to the public sewer line.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $2.8M
- ~160 roofing squares
- ~5 HVAC systems
- ~5 kitchens / 10+ bathrooms
- ~14,000 sq ft of finished living space
- ~6.0 acres of site work (grading, stormwater, landscaping)
- New public water and sewer service to all five lots
- Stormwater management facilities and erosion and sediment control plan
- Dedication of Keeler Road right-of-way
- Proposed easements requiring legal descriptions
- Removal of existing outbuildings