PlannedNearby

Montgomery County · Towamencin · MCPC #18-0278-002

Keeler Road Subdivision

695 Keeler Road, Towamencin, PA · 5 homes, single family · 7.24 acres

About this project

Five single-family detached homes are planned on the roughly 7-acre property at 695 Keeler Road in Towamencin Township, with four lots fronting Keeler Road and one flag lot set farther back. The existing house and spring house will stay, while the detached garage and two kennel buildings will be removed. Public water and sewer are proposed for all five lots.

County planning commission: Supports

Issues raised: Board Of Commissioners, Ontgomery Cou, Montgomery County, Executive Director, Background, Comprehensive Plan Compliance

Engineer / rep.
Cornerstone Consulting Engineers & Design Services, Inc.
Zoning
R-175
Tax parcel
53-00-03968-00-2
Cross street
Tennis Circle
Approvals needed
major subdivision approval, waivers
Utilities
public water, public sewer
Demolition
Detached garage and two kennel buildings

Filing history

  • 2025-09-19 · MCPC #18-0278-002 · Land Dev Plan, SubDiv Plan, Prelim Plan, Resubmission · 5 homes
  • 2018-11-16 · MCPC #18-0278-001 · Land Dev Plan, SubDiv Plan, Prelim Plan · 4 homes

County review letters
2025-09-19 · TOWAM 18-0278-002r.pdf

View all filings on the county site →

The full picture AI research · Nov 1, 2026

The Keeler Road Subdivision would split a roughly 7-acre property at 695 Keeler Road in Towamencin Township into five lots for single-family detached homes. Four lots would face Keeler Road. A fifth "flag lot" would sit farther back and be reached by a narrow strip of land.

The existing house and spring house would stay. The detached garage and two kennel buildings would be torn down. All five lots would connect to public water and sewer.

Township planning commission and board of supervisors agendas and minutes show the plan under review from September 2025 into 2026. The records indicate the plan was first approved years earlier and then revived. No news coverage, organized opposition or builder project page was found. The sources do not say who would build or live in the homes.

What it could mean nearby

Where it stands

The plan is in township review as a combined preliminary/final subdivision plan. It reached the planning commission in September 2025 and the township supervisors' agenda in May 2026. Final approval and recording of the plan were not confirmed, so the next step is a supervisors' vote, then meeting any conditions before the plan is recorded and building permits are sought.

Want to weigh in? The Towamencin Township Board of Supervisors makes the decision after hearing from the planning commission, and residents can comment at their public meetings or by contacting the township office.

Who's behind it

Cornerstone Consulting Engineers & Design Services, Inc. · The county filing lists this engineering and design firm; no builder or developer was identified and no company page was found.

Around the web

Planning terms explained
Subdivision
Dividing one parcel of land into separate lots that can be built on or sold.
Flag lot
A lot set back from the road and reached by a narrow strip, shaped roughly like a flag on a pole.
Preliminary/final plan
A single review that combines the first and last approval steps, often used for smaller projects.
Planning commission
An appointed local board that reviews plans and advises the elected supervisors.
Grinder pump
A small pump at a home that grinds wastewater and pushes it to the public sewer line.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $2.8M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →